Last Modified: 20 May 2013
Council Services
Roading
Council’s Roading Division is responsible for managing the city's roading assets. This includes 234km of roading, 300km of kerbs and channels, 226km of footpath, 3,487
street lights, 52 bridges (including 6 pedestrian foot bridges) and
numerous sumps and street signs.
This is in keeping with Councils Strategic Plan to provide a cost
effective, high quality and safe road system with a transport network
that creates high standards of accessibility within the city and is user
friendly for both residents and visitors as a result of high traffic
engineering standards and good directional signage.
|
Roadworks underway in Upper Hutt this week - Updated 20 May 2013
|
|
Location ... |
Work or event taking place ... |
|
|
Water renewal
|
|
|
Footpath repairs
|
|
|
Vegetation mowing
|
|
|
Sewer maintenance (starts Wednesday)
|
|
|
Footpath repairs |
|
|
Stormwater renewal
|
|
|
Water renewal
|
|
|
Water renewal
|
|
- Fergusson Drive (1003-1011)
|
Footpath repairs
|
|
- Fergusson Drive (1174-1184)
|
Water renewal
|
| |
- Fergusson Drive (rest home opposite Argyle Grove)
|
Kerb and channel replacement |
|
|
Wastewater renewal
|
|
|
Kerb and channel replacement |
|
|
Vegetation mowing
|
|
|
Vegetation mowing
|
| |
|
Wastewater renewal
|
|
|
Water renewal
|
|
|
Digout repairs
|
|
|
Water renewal
|
|
Road Closures for vehicular traffic (requests and/or approved)
|
|
Council’s Roading Division is responsible for managing the city's roading assets. This includes 234km of roading, 300km of kerbs and channels, 226km of footpath, 3,487
street lights, 52 bridges (including 6 pedestrian foot bridges) and
numerous sumps and street signs.
Councils Strategic Plan includes providing a cost
effective, high quality and safe road system with a transport network
that creates high standards of accessibility within the city and is user
friendly for both residents and visitors as a result of high traffic
engineering standards and good directional signage.
|
Scroll down or use the links below to find information about:
|
Approved Road Closures
Note: Requests for road closures are listed below
|
Upcoming road closure notices are published here and in the local newspaper - the Upper Hutt Leader.
- None at this time
|
| Requests for Road Closure |
-
Temporary Road Closure for Rimutaka Trust Upper Hutt Spring Festival on Saturday 14 September 2013
Upper Hutt City Council has received a request for a temporary road
closure of Main Street from the intersection of Main Street and Royal
Street to (but not including) the roundabout at Main Street and King
Street, Wilson Street from the intersection with Main Street to
Criterion Lane, Pine Avenue from the roundabout at Main Street to (but
not including) the roundabout at Queen Street, the Upper Hutt City
Council car park on Pine Avenue including part of Lyster Lane from the
entrance of the car park to the intersection with Pine Avenue, Princes
Street from the intersection with Main Street to the intersection with
Geange Street, Geange Street from the intersection with Main Street to
the pedestrian crossing adjacent to New Leaf, Russell Street from the
intersection with Main Street to the intersection with Mumby Lane,
Wakefield Street from the intersection with Main Street to the
intersection with Mumby Lane and Logan Street from the intersection with
Main Street to the intersection with Ashford Lane
on Saturday 14
September 2013 from 6am-5.30pm for the purpose of The Rimutaka Trust
Upper Hutt Spring Festival organised by the Upper Hutt Women’s Centre. A
map is available on UHCC website. Download the map (PDF, 71Kb)
Submissions closed on Friday
3 May 2013.
|
Requesting a Road Closure (2)
|
The process for requesting a road closure can vary depending on individual circumstances.
|
- Click here if you are requesting a road closure for a community event or activity.
|
|
Road closure requests for events and activities are notified by Council to the public for consultation in the Upper Hutt Leader and below.
|
- All other 'road works' requests for road closures must be submitted using the CAR manager process via BeforeUdig.
|
|
Contact us on 527 2169 if you would like more information.
Note:
Community signboards are available for clubs and organisations to promote community events. Click here for more information about community signboards.
|
BeforeUdig - Corridor access request
|
|
Before you carry out public road works in Upper Hutt, contractors must obtain plans showing the location of existing services at the proposed work site. Contractors can get these plans from beforeUdig.
Contact BeforeUdig on 0800 248 344 or visit the website.
Corridor access request
beforeUdig now automatically lodge your Corridor Access Requests while you submit your enquiries. More information about corridor access requests. |
Specifications for working on Upper Hutt roads
|
|
|
If you intend to carry out work on Upper Hutt roads please refer to the latest national and local specifications that set out our requirements.
|
|
Note:
These conditions apply in both Hutt City and Upper Hutt City and are to be read as an integral part of the main "Code of Practice"
|
|
|
Traffic Management - Application for delegated authority to approve traffic management plans (TMPs)
|
Please complete the application form below and return to Council with a copy of your STMS qualification.
|
|